Doubleview Gold Corp. Announces Successful Completion of 2025 Drilling Season at the Hat Project, the Largest Drill Season yet with 13,290m Diamond Drill Core

Doubleview Gold Corp. (“Doubleview” or the “Company”) (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) is pleased to announce the completion of its 2025 drilling season at the Hat Polymetallic Project in northwestern British Columbia. This year’s program marks the largest...

Doubleview Extends High-Grade Domains at Hat: H099 Returns 438m of 0.40% CuEq Including 52m of 1.02% CuEq, Expanding Mineralization Envelope Around Conceptual Pit Vertically and Laterally

Doubleview Gold Corp. (“Doubleview” or the “Company”) (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) is pleased to announce assay results from drill holes H097, H098, and H099 from its 2025 drill program at the Hat Polymetallic Deposit in northwestern British Columbia. Drill...

Doubleview Gold Corp Announces 320-Meter Eastward Extension at the Hat Polymetallic Deposit, Expanding Mineralized Volume and Remaining Open

Doubleview Gold Corp (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) (“Doubleview” or the “Company”) is pleased to report that ongoing drilling at its 100%-owned Hat Polymetallic Deposit in northwestern British Columbia has extended the mineralized system approximately 320...

Doubleview Gold Corp Announces Important High-Grade Copper and Gold Intercepts at Hat Polymetallic Deposit in Northwestern British Columbia

Highlights: 2025 season drilling totals 8,506 metres in 12 drill holes and is continuing. Drill hole assay intervals include some of the highest-grade mineralization intercepted to date at the Hat Project. Recent drill holes are extending the mineralization envelope...